    sCO₂ Allam-Fetvedt Scenario Terminal

    Explore oxy-combustion with supercritical CO₂ as the working fluid. Full capture at 150 bar, CO₂ sales, avoided ETS costs and grant funding are scenario assumptions, not assured project outcomes.

    Stage-gate review

    sCO₂ cycle and fuel parameters

    100% capture assumed

    Inlet pressure is a descriptive parameter and does not change this simplified balance. Gross efficiency is an input; it is not calculated from pressure and temperature.

    Power plant economics and CO₂ offtake

    CO₂ capture scenario
    Levelised cost of electricity (LCOE)
    75.79 € / MWh
    Includes assumed CO₂ revenue
    Modelled CO₂ capture
    956 kt/a
    Assumption: 100% at 150 bar
    Annual EBITDA
    67.6 €m
    28.6% margin
    Simple payback period
    8.22 years
    Model life: 30 years
    Power balance and revenue breakdown
    Net electrical output:283 MWe (47.2% efficiency)
    Net investment after grant:555 €m
    Annual electricity PPA revenue:196.3 €m/year
    Assumed CO₂ offtake revenue:40.1 €m/year
    Theoretical avoided ETS costs:81.2 €m/year
    Fuel and operating expenditure:168.9 €m/year

    The ETS figure is a separate comparison value and is not included in EBITDA or LCOE. CO₂ revenue and grant funding are assumed in the calculation; this does not establish an offtake contract, transport, storage or a funding award.

    Results report and review requirements

    Use the print dialog to save the report as a PDF. Inputs, results and model limitations are included.

    Modelled power balance: 600 MWth of thermal fuel input gives 283 MWe net electrical output (47.2% net efficiency). Assuming full capture, the model yields 955,541 tonnes of CO₂ per year at an assumed 150 bar delivery pressure. These are scenario results, not measured plant performance.
    Capture concept and auxiliary demand: oxy-combustion with CO₂ recycling enables separation of water from a CO₂-rich stream. This simplified model includes ASU, compressor and other auxiliary loads, but no amine absorption unit. Purity, gas treatment, transport, storage losses and life-cycle emissions require a separate project assessment.
    Assumed revenue: annual electricity PPA revenue is €196.3m and CO₂ offtake revenue is €40.1m. The theoretical avoided ETS cost of €81.2m is shown separately and excluded from EBITDA and LCOE. CO₂ sales do not automatically establish ETS relief or certified removals.
    Scenario economics: net capital expenditure is €555m after applying €110m of the assumed grant. Annual EBITDA is €67.6m; simple payback is 8.22 years. LCOE is €75.79/MWh. A grant award and a CO₂ offtake agreement have not been established by this calculation.

    Regulatory status: not assessed

    This scenario does not establish ETS exemption, CRCF certification or a plant permit. Review the specific CO₂ pathway, evidence, permits and grant award.

    Methodology, model limitations and regulatory sources

    Supercritical CO₂ as the working fluid
    The model describes an oxy-combustion cycle with CO₂ recycling. Pressure and temperature are descriptive inputs. Electrical output is calculated from thermal input and assumed gross efficiency, less ASU, compressor and other auxiliary loads; this is not a thermodynamic process simulation.
    Capture and the carbon pathway
    The balance assumes full capture at 150 bar. It does not measure purity, leakage or life-cycle emissions. Biomethane alone does not establish net removal: feedstock origin, life-cycle accounting and permanent storage of the biogenic carbon must be demonstrated.
    EU ETS, CRCF and permitting
    ETS relief depends on a verified storage route or qualifying permanent chemical binding; selling CO₂ for e-fuels does not establish a blanket exemption. The CRCF Regulation requires separate certification. COM(2024) 62 is a strategy. Plant permits and Innovation Fund awards require separate assessment.
    AME Module en · Energie
    Energy & ESG - Next step

    Let us scan your energy portfolio in 60 minutes.

    Under NDA. We look at your top 3 assets and identify the biggest levers - at no cost. Yield models and subsidy stack discussed concretely.

    NDA-First
    P50/P90 model
    Subsidy stack incl.

    Cookie Settings

    You choose whether to allow analytics and marketing in addition to essential functions. See our privacy policy for details about Google Analytics and data processing. Privacy Policy