sCO₂ Allam-Fetvedt Scenario Terminal
Explore oxy-combustion with supercritical CO₂ as the working fluid. Full capture at 150 bar, CO₂ sales, avoided ETS costs and grant funding are scenario assumptions, not assured project outcomes.
sCO₂ cycle and fuel parameters
Inlet pressure is a descriptive parameter and does not change this simplified balance. Gross efficiency is an input; it is not calculated from pressure and temperature.
Power plant economics and CO₂ offtake
The ETS figure is a separate comparison value and is not included in EBITDA or LCOE. CO₂ revenue and grant funding are assumed in the calculation; this does not establish an offtake contract, transport, storage or a funding award.
Results report and review requirements
Use the print dialog to save the report as a PDF. Inputs, results and model limitations are included.
Regulatory status: not assessed
This scenario does not establish ETS exemption, CRCF certification or a plant permit. Review the specific CO₂ pathway, evidence, permits and grant award.
Scenario and review status
Explore oxy-combustion with supercritical CO₂ as the working fluid. Full capture at 150 bar, CO₂ sales, avoided ETS costs and grant funding are scenario assumptions, not assured project outcomes.
Regulatory status: not assessed
This scenario does not establish ETS exemption, CRCF certification or a plant permit. Review the specific CO₂ pathway, evidence, permits and grant award.
Complete inputs
| Parameter | Value |
|---|---|
| Fuel and feedstock scenario | Pipeline-quality natural gas (fossil CO₂) |
| Thermal fuel input | 600.000 MWth |
| Turbine inlet pressure (descriptive) | 300.000 bar |
| Turbine inlet temperature (descriptive) | 1,150.000 °C |
| Assumed gross cycle efficiency | 59.000 % |
| ASU auxiliary load per thermal input | 0.065 MWe/MWth |
| CO₂ compressor auxiliary load | 20.000 MWe |
| Capacity factor | 90.000 % |
| Fuel price | 32.000 €/MWhth |
| Electricity PPA offtake price | 88.000 €/MWh |
| Assumed CO₂ offtake price | 42.000 €/t |
| ETS comparison price | 85.000 €/tCO₂ |
| Overnight capital cost per electrical capacity | 2,350.000 €/kWe |
| Annual fixed operating cost per electrical capacity | 62.000 €/kW/a |
| Assumed Innovation Fund grant | 110,000,000.000 € |
| Model life | 30.000 a |
| Discount rate (WACC) | 6.000 % |
Calculated results
| Parameter | Value |
|---|---|
| Gross electrical output | 354.000 MWe |
| Total auxiliary load | 71.000 MWe |
| Net electrical output | 283.000 MWe |
| Net efficiency (LHV) | 47.200 % |
| Annual net electricity generation | 2,231,172.000 MWh/a |
| Modelled annual CO₂ capture | 955,541.000 t/a |
| Annual electricity PPA revenue | 196,343,136.000 €/a |
| Assumed annual CO₂ revenue | 40,132,722.000 €/a |
| Theoretical avoided ETS costs (separate comparison) | 81,220,985.000 €/a |
| Gross benefit including separate ETS comparison | 317,696,843.000 €/a |
| Annual fuel cost | 151,372,800.000 €/a |
| Annual fixed operating cost | 17,546,000.000 €/a |
| Total annual operating cost | 168,918,800.000 €/a |
| Annual EBITDA | 67,557,058.000 €/a |
| EBITDA margin | 28.600 % |
| Levelised cost of electricity (LCOE) | 75.790 €/MWh |
| Gross overnight capital expenditure | 665,050,000.000 € |
| Assumed grant applied against capital expenditure | 110,000,000.000 € |
| Unapplied grant excess | 0.000 € |
| Net capital expenditure after assumed grant | 555,050,000.000 € |
| Simple payback period | 8.220 a |
The ETS figure is a separate comparison value and is not included in EBITDA or LCOE. CO₂ revenue and grant funding are assumed in the calculation; this does not establish an offtake contract, transport, storage or a funding award.
Model assumptions
Full CO₂ capture and 150 bar delivery pressure are model assumptions, not verified performance.
CO₂ revenue and grant funding are assumed; storage, life-cycle emissions, ETS relief and CRCF certification are not assessed. The assumed grant is capped at gross capital expenditure: €110,000,000 is applied and €0 remains unapplied. Any grant excess does not reduce capital expenditure below zero, is not revenue and is not a funding commitment.
Pressure and temperature are descriptive inputs, not a thermodynamic efficiency calculation.
Results report and review requirements
Modelled power balance: 600 MWth of thermal fuel input gives 283 MWe net electrical output (47.2% net efficiency). Assuming full capture, the model yields 955,541 tonnes of CO₂ per year at an assumed 150 bar delivery pressure. These are scenario results, not measured plant performance.
Capture concept and auxiliary demand: oxy-combustion with CO₂ recycling enables separation of water from a CO₂-rich stream. This simplified model includes ASU, compressor and other auxiliary loads, but no amine absorption unit. Purity, gas treatment, transport, storage losses and life-cycle emissions require a separate project assessment.
Assumed revenue: annual electricity PPA revenue is €196.3m and CO₂ offtake revenue is €40.1m. The theoretical avoided ETS cost of €81.2m is shown separately and excluded from EBITDA and LCOE. CO₂ sales do not automatically establish ETS relief or certified removals.
Scenario economics: net capital expenditure is €555m after applying €110m of the assumed grant. Annual EBITDA is €67.6m; simple payback is 8.22 years. LCOE is €75.79/MWh. A grant award and a CO₂ offtake agreement have not been established by this calculation.
Methodology, model limitations and regulatory sources
The model describes an oxy-combustion cycle with CO₂ recycling. Pressure and temperature are descriptive inputs. Electrical output is calculated from thermal input and assumed gross efficiency, less ASU, compressor and other auxiliary loads; this is not a thermodynamic process simulation.
The balance assumes full capture at 150 bar. It does not measure purity, leakage or life-cycle emissions. Biomethane alone does not establish net removal: feedstock origin, life-cycle accounting and permanent storage of the biogenic carbon must be demonstrated.
ETS relief depends on a verified storage route or qualifying permanent chemical binding; selling CO₂ for e-fuels does not establish a blanket exemption. The CRCF Regulation requires separate certification. COM(2024) 62 is a strategy. Plant permits and Innovation Fund awards require separate assessment.
Official sources
- EU ETS Directive, Article 12https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02003L0087-20240301
- CRCF Regulation (EU) 2024/3012https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32024R3012
- Industrial Carbon Management, COM(2024) 62https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=COM:2024:62:FIN
- Plant permitting: section 4 BImSchG (German statutory text)https://www.gesetze-im-internet.de/bimschg/__4.html
- Innovation Fund: award procedure (European Commission)https://climate.ec.europa.eu/areas-action/eu-funding-climate-action/innovation-fund/what-innovation-fund_en