Skip to main content
    Home/Process Governance & Stage Gates

    Stage-Gate Process Governance & Telemetry

    Deterministic 6-stage milestone architecture for M&A transactions and renewable energy · Governance to the AME Standard · Full integration of all 50 calculation engines.

    Browse all tools

    Institutional 6-Stage-Gate Transaction & Project Cycle

    Binding milestone approvals · Audit evidence · Role-based governance

    Institutional M&A Transaction & Post-Merger Lifecycle
    Active milestone

    Gate 1: Strategic Target Fit & Preliminary Valuation

    Approval status: Approved

    Initial review of market standing, synergy thesis, and indicative DCF / multiple valuation.

    Mandatory Evidence Checklist
    • Teaser / Blind-Profile
    • Indicative DCF Valuation Dossier
    • Non-Disclosure Agreement (NDA)
    Role Accountability & Legal Framework
    Responsible role:lead partner
    Legal basis:IDW S 1, HGB §§ 238 ff., WpÜG, BGB §§ 433 ff.
    Linked calculation engines:12 specialist engines

    Stage-Gate Audit Trail & Evidence Sign-Off Protocol

    Audit-proof milestone approval · Role-based sign-off · Go/no-go decision lock

    Gate 1: Strategic Target Fit & Preliminary Valuation

    Initial review of market standing, synergy thesis, and indicative DCF / multiple valuation.

    Gate owner:Deal Lead / Senior Partner
    Mandatory evidence & document checklist (audit trail):3 of 3 evidence items verified
    Teaser / Blind-Profile
    Audit evidence provided & signed
    Indicative DCF Valuation Dossier
    Audit evidence provided & signed
    Non-Disclosure Agreement (NDA)
    Audit evidence provided & signed
    GATE STATUS: APPROVED (All mandatory evidence on file · Cleared for the next phase)
    Sign protocol
    Cross-Sector Strategic Synergy Mesh & Co-Investment Matrix

    Interactive leverage simulation: linking energy, AI, industrial, real estate and M&A structures.

    Active sector clusters:3 / 5
    EBITDA Multiple Expansion
    +2.55x
    Valuation uplift from vertical integration & ESG premium
    Cross-Asset Cost Synergies
    -16.5%
    OpEx savings from waste heat recovery, fixed-price PPAs & grid rebates
    WACC Cost-of-Capital Advantage
    -135 bps
    More favorable green bond & project finance terms
    Active Synergy Pillars & Institutional Master Terminals
    CleanTech & Power Grid
    Baseload hedging via SMR & offshore PPAs
    Peak shaving & balancing power via BESS & VPP
    Grid fee reduction of up to 40% under § 14a of the Energy Industry Act (EnWG)
    AI & Sovereign Compute
    PUE < 1.15 through direct liquid cooling
    Waste heat feed-in to municipal district heating networks
    Low-latency constellation backhaul for edge AI
    Heavy Industry & Circular Economy
    EU ETS CO2 cost avoidance of up to €120/t CO2
    Recycled content quotas (EU 2023/1542) secured
    Green hydrogen for PtX e-kerosene / SAF

    Institutional Multi-Asset Portfolio Allocation & Capital Governance

    Dynamic capital steering across 5 strategic asset classes · Blended WACC, levered IRR & SFDR Article 9

    SFDR Art. 9 Dark Green (94.3%)
    Fund equity volume€2.5bn
    Holding Multiple Expansion+1.8x EBITDA
    OpEx synergy rate (cross-asset)3.5% p.a.
    Asset Class Weighting & Financial LeverageTotal allocation: 100% ✓
    Renewable Energy & HVDC Grid Infrastructure
    Unlevered Target IRR: 10.5%Horizon: 10 yrs
    Portfolio share:35%
    Debt ratio (LTV / D/E):70% debt
    Quantum Crypto, AI & Space Infrastructure
    Unlevered Target IRR: 18%Horizon: 7 yrs
    Portfolio share:20%
    Debt ratio (LTV / D/E):40% debt
    Industrial Decarbonization & Circular Materials
    Unlevered Target IRR: 14.5%Horizon: 8 yrs
    Portfolio share:20%
    Debt ratio (LTV / D/E):60% debt
    Healthcare, MedTech & Precision Biotechnology
    Unlevered Target IRR: 16%Horizon: 7 yrs
    Portfolio share:15%
    Debt ratio (LTV / D/E):45% debt
    ESG Real Estate, Logistics & Advanced Air Mobility
    Unlevered Target IRR: 9.5%Horizon: 9 yrs
    Portfolio share:10%
    Debt ratio (LTV / D/E):65% debt
    Total Enterprise Value (TEV)
    €6.40bn
    Equity: €2.50bn | Debt: €3.90bn
    Weighted Levered IRR
    27.74%
    Unlevered IRR: 13.53% p.a.
    Projected Exit Value
    €20.09bn
    Multiple on Capital: 3.14x MoIC
    Blended Portfolio WACC
    7.92%
    Synergy value: €17.9m p.a.
    Institutional Allocation Recommendations & Governance Synthesis
    Capital allocation & portfolio size: With €2.50bn of equity commitments, the fund mobilizes €3.90bn of debt and manages a total enterprise value (TEV) of €6.40bn.
    Return profile & financial leverage: The portfolio achieves a weighted levered IRR of 27.74% (unlevered 13.53%) at a blended WACC of 7.92%.
    Exit value & multiple on capital: The modeled exit valuation over the holding horizon amounts to €20.09bn (3.14x MoIC), supported by 1.8x multiple expansion.
    SFDR Article 9 taxonomy alignment: With a taxonomy ratio of 94.3%, the fund meets the strict criteria of a 'dark green' impact fund under EU Regulation 2019/2088.

    Multi-Horizon Capital Calls (J-Curve) & Liquidity Stress Test

    Monte Carlo interest rate & revenue shock simulation · DSCR resilience & distribution dynamics over 10 years

    Min. DSCR: 1.53x (Robust)
    Fund size (equity)€1.0bn
    Macro interest rate shock+200 bps (+2.0%)
    Revenue contraction-12% revenue decline
    Liquidity buffer8.0% (€80m)
    Net TVPI Multiple
    1.99x
    Total distributions: €1.99bn
    Max. Cash Trough (J-Curve)
    €842m
    Maximum cumulative capital requirement
    Stressed Portfolio IRR
    12.56%
    Base IRR: 14.5% (-1.9% shock)
    Min. Debt Service Coverage
    1.53x
    Covenant threshold: > 1.20x
    10-Year Capital Call, Distribution & DSCR Schedule
    YearCapital call (€)Cumulative calls (€)Dry powder (€)Distribution (€)Cumul. distributions (€)Net cash flow (€)Stressed DSCR
    Y1€150m€150m€850m€0m€0m-€150m1.53x
    Y2€250m€400m€600m€0m€0m-€250m1.53x
    Y3€300m€700m€300m€0m€0m-€300m1.53x
    Y4€200m€900m€100m€58m€58m-€142m1.53x
    Y5€100m€1,000m€0m€136m€193m+€36m1.53x
    Y6€0m€1,000m€0m€224m€417m+€224m1.53x
    Y7€0m€1,000m€0m€356m€773m+€356m1.53x
    Y8€0m€1,000m€0m€458m€1,231m+€458m1.53x
    Y9€0m€1,000m€0m€407m€1,638m+€407m1.53x
    Y10€0m€1,000m€0m€356m€1,994m+€356m1.53x
    Liquidity & Risk Resilience Findings
    J-curve capital calls: The maximum liquidity trough is €842.2m in year 4.
    Stressed DSCR & interest rate resilience: Under an interest rate shock of +200 bps and a 12% revenue decline, the minimum DSCR remains at 1.53x (creditworthiness secured).
    Distribution dynamics (DPI/TVPI): Projected total distributions amount to €1.99bn (1.99x TVPI).
    Emergency liquidity buffer: A buffer of 8% (€80.0m) ensures uninterrupted operations across all holding phases.

    Institutional Deal Origination & Transaction Pipeline

    Live monitoring of active M&A, CleanTech & DeepTech mandates along the 6-stage-gate process

    6 Active Mandates (€6.76bn TEV)
    Total Pipeline Volume (TEV)
    €6.76bn
    6 qualified transactions
    Committed Equity
    €2.43bn
    Fund Equity Commitment
    Syndicated Debt
    €4.33bn
    EIB / KfW / syndicate banks
    Weighted Target IRR
    17.01%
    Weighted Target Return
    Filter Stage:
    MAN-2026-081·Signing & Closing

    Project Hyperion Grid

    Transnational HVDC Interconnectors & Offshore Wind
    €1,450m
    Target IRR: 11.2%
    Equity ticket:
    €450m
    Debt facility:
    €1,000m
    Financial close with EIB & KfW IPEX-Bank; Ten-Year Network Plan approval
    SFDR Art. 9 Dark GreenOpen calculation terminal
    MAN-2026-082·Confirmatory FDD/LDD

    Project Quantum Iris

    Sovereign QKD Satellite Constellation & Optical Laserlinks
    €680m
    Target IRR: 18.5%
    Equity ticket:
    €290m
    Debt facility:
    €390m
    EuroQCI audit & FDD completion for 24 LEO satellite payloads
    SFDR Art. 8+ TransitionOpen calculation terminal
    MAN-2026-083·Regulatory Filing

    Project ZeroCarbon Power

    300 MWe sCO2 Allam Cycle Oxy-Combustion Power Plant
    €790m
    Target IRR: 13.8%
    Equity ticket:
    €260m
    Debt facility:
    €530m
    BImSchG permitting submission & EU Innovation Fund grant award
    SFDR Art. 9 Dark GreenOpen calculation terminal
    MAN-2026-084·Preliminary Screening

    Project SolidState Gigacell

    20 GWh Solid-State Battery Dry-Room Gigafactory
    €2,200m
    Target IRR: 19.2%
    Equity ticket:
    €750m
    Debt facility:
    €1,450m
    North Germany site selection & Digital Battery Passport pilot
    SFDR Art. 9 Dark GreenOpen calculation terminal
    MAN-2026-085·Origination & Intake

    Project Fusion Core Alpha

    Compact HTS Tokamak Fusion Reactor (20 Tesla REBCO)
    €1,100m
    Target IRR: 22%
    Equity ticket:
    €500m
    Debt facility:
    €600m
    Euratom pre-certification & high-field magnet bench testing
    SFDR Art. 9 Dark GreenOpen calculation terminal
    MAN-2026-086·Post-Merger Integration

    Project Nordic Lithia

    Geothermal Direct Lithium Extraction & Circular Recycling
    €540m
    Target IRR: 16.4%
    Equity ticket:
    €180m
    Debt facility:
    €360m
    Full integration of adsorption columns & 98% Li recovery yield
    SFDR Art. 9 Dark GreenOpen calculation terminal

    Virtual Data Room (VDR) & Confirmatory Due Diligence Gate

    Live review of all 8 DD workstreams · Red-flag severity, W&I insurability & escrow sizing

    Signing with Conditions / Covenants
    Transaction value (EV)€500m
    FDI screening (AWV):
    Merger control (antitrust):
    W&I insurance:
    Overall DD Progress
    85.8%
    Health Score: 75/100
    W&I Underwriting Viability
    51%
    Exclusions
    Escrow Holdback
    €45.0m
    9% of enterprise value
    Remaining Time to Closing
    approx. 102 days
    Incl. regulatory approvals
    8 Due Diligence Workstreams: Audit Status & Sign-OffsRed flags: 0 critical · 8 moderate
    Financial Due Diligence & Quality of Earnings
    Document review:95% complete
    Workstream weight: 18%Audit score: 87/100
    Legal, Corporate Governance & Key Contracts DD
    Document review:90% complete
    Workstream weight: 15%Audit score: 74/100
    Technical, Engineering & Grid Yield DD
    Document review:88% complete
    Workstream weight: 15%Audit score: 80/100
    Tax Structuring & Interest Barrier Shield DD
    Document review:92% complete
    Workstream weight: 12%Audit score: 92/100
    ESG, CSRD & SFDR Art. 9 Regulatory DD
    Document review:85% complete
    Workstream weight: 10%Audit score: 77/100
    IT, Cybersecurity & DORA/NIS-2 Resilience DD
    Document review:80% complete
    Workstream weight: 10%Audit score: 64/100
    FDI Screening (AWV) & Antitrust Clearance
    Document review:75% complete
    Workstream weight: 10%Audit score: 67/100
    Post-Merger Integration & 100-Day Synergy Plan
    Document review:70% complete
    Workstream weight: 10%Audit score: 70/100
    Audit Results & Transaction Approval Recommendations
    Overall progress & health score: The due diligence has reached 85.8% completion with a health score of 75/100 and an adviser sign-off ratio of 60%.
    Red-flag risk profile: 0 critical deal breakers and 8 moderate risk areas identified (risk severity index: 25/100).
    W&I insurability: Underwriting feasibility for a warranty & indemnity policy stands at 51% (exclusions to be expected).
    Escrow holdback: Recommended purchase price retention of 9% of enterprise value (€45.0m), with an estimated 102 days remaining until closing.

    M&A Term Sheet, Valuation Bridge & Escrow Structuring

    Locked box vs. completion accounts · NWC peg adjustment, de minimis, baskets & W&I liability caps

    Balanced Market Standard
    Enterprise value (EV)€250m
    Net financial debt-€35m
    NWC vs. Target PEG (+/-)+€2m
    Escrow holdback rate3.5% of EV
    Closing mechanism:
    W&I insurance:
    Claims basket:
    Valuation Bridge (Enterprise Value to Equity Purchase Price)
    Headline EV
    €250.0m
    Valuation basis
    NWC adjustment
    +€2.0m
    Actual NWC vs. peg
    Effective equity value
    €217.0m
    Purchase price at closing
    Escrow amount
    €8.8m
    Cash at closing: €208.3m
    De minimis threshold:
    €250k
    Threshold for individual claims
    Basket (tipping):
    €2,500k
    1.0% of transaction value
    Seller liability cap:
    €1.25m
    W&I policy retention
    Negotiation Recommendations & Contract Clause Optimization
    Valuation bridge (EV to equity value): Starting from an EV of €250.0m, deducting net financial debt (-€35.0m) and applying the NWC adjustment (+€2.0m) results in an effective equity purchase price of €217.0m.
    Closing cash & escrow: At closing, €208.3m is paid to the sellers in cash, while €8.8m (3.5%) is held in a notary escrow account for 18 months.
    Liability limitation & W&I policy: The warranty & indemnity insurance limits seller liability to the retention of €1.25m.
    Thresholds & basket: The de minimis threshold is €250k; the basket (tipping basket, first-euro recovery) amounts to €2,500k.

    Institutional CleanTech & DeepTech Statutory Accord

    Normative anchoring of all 50 master calculation engines in European & international legislation

    EU & German Federal Law SSOT
    Legislation & Directives
    Regulation (EU) 2024/1735

    EU Net-Zero Industry Act (NZIA)

    European Commission
    Key legal & institutional obligations:
    Attainment of 40% EU domestic manufacturing benchmark for strategic net-zero technologies by 2030
    Binding EU-wide geological CO2 injection capacity target of 50 Mt per annum by 2030
    Streamlined permitting timelines for Net-Zero Strategic Projects (maximum 18 months)

    50 Master Calculation Engines & Telemetry Registry

    Verified to the AME Standard · 100% test pass rate · Statutory & institutional sourcing

    Registered Engines
    50 Kernels
    Verification Status
    AME Standard
    Unit Test Pass Rate
    100% (1,204 tests)
    Language Support
    Bilingual (DE / EN)
    institutional100% Pass

    dcf valuation terminal

    Focus: Enterprise Value (EV) & Equity Value
    Standard: IDW S 1, IFRS 13, WACC / CAPM Standards
    dcfValuationTerminal.tsOpen terminal
    institutional100% Pass

    ppa energy yield engine

    Focus: PPA Net Present Value & Capture Rates
    Standard: EEG 2023/2024, EnWG, BNetzA Guidelines
    ppaEnergyYield.tsOpen terminal
    institutional100% Pass

    working capital simulator

    Focus: Cash Release & Interest Savings
    Standard: Cash Conversion Cycle (CCC), IFRS / HGB
    workingCapitalSimulator.tsOpen terminal
    institutional100% Pass

    bess battery revenue stacker

    Focus: Multi-Market Revenue Stacking & Degradation NPV
    Standard: FCR / aFRR, Day-Ahead / Intraday Arbitrage
    bessRevenueStacker.tsOpen terminal
    institutional100% Pass

    csrd supply chain radar

    Focus: Supply Chain ESG Penalty Exposure
    Standard: Corporate Sustainability Due Diligence Directive (CSDDD), German LkSG
    csrdSupplyChainRadar.tsOpen terminal
    institutional100% Pass

    brown to green optimizer

    Focus: Stranding Risk Year & Green Premium Yield
    Standard: GEG 2024, EU Taxonomy Climate Mitigation Criteria
    brownToGreenOptimizer.tsOpen terminal
    institutional100% Pass

    csrd materiality matrix

    Focus: Double Materiality Impact & Financial Exposure
    Standard: EFRAG ESRS 1 / ESRS 2 Double Materiality Guidelines
    csrdMaterialityMatrix.tsOpen terminal
    institutional100% Pass

    dscr leverage stresstester

    Focus: DSCR, ICR & Debt Headroom Stress Test
    Standard: LMA Leveraged Finance Standards, Senior/Mezzanine Covenants
    dscrLeverageStresstester.tsOpen terminal
    institutional100% Pass

    bolt on pipeline radar

    Focus: Blended Valuation Multiple & Synergy Value
    Standard: Private Equity Buy-and-Build Strategy, Multiple Arbitrage
    boltOnPipelineRadar.tsOpen terminal
    institutional100% Pass

    cap table waterfall simulator

    Focus: Class-by-Class Exit Payout & Equity RoI
    Standard: NVCA Liquidation Preference Standards, 1x/2x Non-Participating/Participating
    capTableWaterfallSimulator.tsOpen terminal
    institutional100% Pass

    carried interest fund waterfall simulator

    Focus: GP Carry vs LP Net DPI / MoIC / Net IRR
    Standard: ILPA Private Equity Waterfall Principles (European vs American Structure)
    carriedInterestFundWaterfall.tsOpen terminal
    institutional100% Pass

    earn out structuring simulator

    Focus: Monte Carlo Risk-Adjusted Earn-Out Fair Value
    Standard: M&A Purchase Price Allocation, IFRS 3 Contingent Consideration
    earnOutStructuringSimulator.tsOpen terminal
    institutional100% Pass

    real estate development yield

    Focus: Developer Margin, Profit on Cost & Max Land Value
    Standard: DIN 276 (construction costs), ImmoWertV residual value method
    realEstateDevelopmentYield.tsOpen terminal
    institutional100% Pass

    interest barrier tax shield

    Focus: Non-Deductible Interest & Tax Surcharge
    Standard: § 4h EStG / § 8a KStG (interest barrier rule), Growth Opportunities Act 2024
    interestBarrierTaxShield.tsOpen terminal
    institutional100% Pass

    beg efficiency subsidy optimizer

    Focus: Max Non-Repayable Grant & Net Financing Need
    Standard: KfW BEG funding guidelines for non-residential and residential buildings (NWG / WG), WPB & EE bonus rates
    begEfficiencySubsidy.tsOpen terminal
    institutional100% Pass

    holding wealth shield

    Focus: Tax-Free Capital Reinvestment Alpha
    Standard: § 8b KStG (95% participation exemption), § 9 No. 1 GewStG, § 17 EStG
    holdingWealthShield.tsOpen terminal
    institutional100% Pass

    khzg hospital transformation simulator

    Focus: Standby Budget Shift & DRG Deficit Mitigation
    Standard: Hospital Care Improvement Act (KHVVG), Hospital Future Act (KHZG) digitalization funding criteria
    khzgTransformationSimulator.tsOpen terminal
    institutional100% Pass

    sfdr taxonomy alignment

    Focus: Portfolio Taxonomy Turnover/CapEx Alignment
    Standard: Sustainable Finance Disclosure Regulation (SFDR Article 6, 8, 9), EU Taxonomy Regulation
    sfdrTaxonomyAlignment.tsOpen terminal
    institutional100% Pass

    cbam carbon tax exposure

    Focus: 2026-2034 Phased-in Carbon Duty Exposure
    Standard: EU CBAM Regulation (EU) 2023/956, German BEHG / nEHS
    cbamCarbonTaxExposure.tsOpen terminal
    institutional100% Pass

    pmi synergy tracker

    Focus: 5-Year J-Curve Synergy Realization & Enterprise Value Uplift
    Standard: McKinsey PMI Framework, IDW S 1 Synergy Valuation Guidelines
    pmiSynergyTracker.tsOpen terminal
    institutional100% Pass

    fleet electrification charging terminal

    Focus: TCO Cost Parity & Depot Charging Return
    Standard: Clean Vehicles Directive, § 14a EnWG, 38. BImSchV GHG quota credits
    fleetElectrification.tsOpen terminal
    institutional100% Pass

    carve out tsa simulator

    Focus: TSA Runway Cost & Seller Stranded Cost Elimination
    Standard: Bain & Company Carve-Out Playbook, PwC Separation Framework
    carveOutTsaSimulator.tsOpen terminal
    institutional100% Pass

    agri pv yield optimizer

    Focus: Land Equivalent Ratio (LER), Dual-Yield EBITDA & LCOE
    Standard: DIN SPEC 91434, EEG 2024 (§ 37, § 38b), EU CAP Direct Payments
    agriPvYieldOptimizer.tsOpen terminal
    institutional100% Pass

    hydrogen electrolyzer terminal

    Focus: Levelized Cost of Hydrogen (LCOH in €/kg H2) & By-Product Monetization
    Standard: EU Renewable Hydrogen Delegated Acts (RED II/III Article 27), German NWS
    hydrogenElectrolyzer.tsOpen terminal
    institutional100% Pass

    cvc safe financing simulator

    Focus: Series A Dilution, Valuation Cap & ESOP Post-Money Cap Table
    Standard: Y-Combinator Post-Money SAFE Standard, German Convertible Loan Agreements (under BGB/GmbHG)
    cvcSafeFinancingSimulator.tsOpen terminal
    institutional100% Pass

    green lease indexation optimizer

    Focus: CPI (VPI) Rent Progression, § 555c BGB Modernization Surcharge & Asset Value Uplift
    Standard: German Price Clause Act (§ 3 PrKG), German Civil Code (§ 555c BGB), European Green Lease Standard
    greenLeaseIndexation.tsOpen terminal
    institutional100% Pass

    dual class share governance terminal

    Focus: Founder Voting Wedge Ratio, Sunset Timeline & Takeover Defense Score
    Standard: German Future Financing Act (ZuFinG / § 135a AktG multiple-voting shares), EU Listing Act Directive
    dualClassGovernance.tsOpen terminal
    institutional100% Pass

    data center sustainability terminal

    Focus: PUE Efficiency Factor, Energy Reuse Factor (ERF) & District Heating Feed-in Net Revenue
    Standard: German Energy Efficiency Act (EnEfG § 11, data centers), DIN EN 50600-4
    dataCenterSustainability.tsOpen terminal
    institutional100% Pass

    ai factory gpu cluster terminal

    Focus: GPU Cluster TCO, Cloud Arbitrage Savings, Payback Period & Token Production Cost (€/1M tokens)
    Standard: SemiAnalysis GPU TCO Guidelines, EU AI Act High-Risk Compute Thresholds (Art. 51), OCP
    aiFactoryGpuCluster.tsOpen terminal
    institutional100% Pass

    medtech mdr regulatory terminal

    Focus: Total Regulatory CapEx to CE Mark, Time-to-Market, 5-Year Lifecycle TCO & Break-Even Units
    Standard: EU Medical Device Regulation (MDR 2017/745), IVDR 2017/746, ISO 13485:2016, § 139e SGB V DiGA
    medtechMdrCostToMarket.tsOpen terminal
    institutional100% Pass

    biomethane plant economics terminal

    Focus: Annual Biomethane MWh, GHG Quota Net Revenue (€/t CO2eq), Levelized Cost of Biomethane (LCOB) & EBITDA Margin
    Standard: 38. BImSchV (Federal Immission Control Act / GHG Quota), § 33 GasNZV, EU RED II/III Mass Balancing
    biomethanePlantEconomics.tsOpen terminal
    institutional100% Pass

    geothermal district heating terminal

    Focus: Thermal Capacity (MWth), BEW Module 2 40% Grant (€), Levelized Cost of Heat (LCOH) & 25-Year Project NPV
    Standard: German Heat Planning Act (WPG 2024), BAFA BEW Module 1-4 (Federal Efficient Heating Subsidy), BVG
    geothermalDistrictHeating.tsOpen terminal
    institutional100% Pass

    smr nuclear economics terminal

    Focus: Overnight CapEx ($/kWe), Interest During Construction (IDC), Levelized Cost of Electricity (LCOE) & Baseload PPA Revenue
    Standard: IAEA Advanced SMR Guidelines, OECD Nuclear Energy Agency (NEA) SMR Cost Benchmarks, EURATOM Treaty
    smrNuclearEconomics.tsOpen terminal
    institutional100% Pass

    e methanol saf economics terminal

    Focus: Annual SAF Tonnes, Green H2/CO2 Feedstock Demands, Levelized Cost of SAF (LCOSAF, €/t & €/l) & EBITDA
    Standard: EU ReFuelEU Aviation Regulation (EU 2023/2405), FuelEU Maritime (EU 2023/1805), EU RED III RFNBO
    eMethanolSafEconomics.tsOpen terminal
    institutional100% Pass

    direct lithium extraction terminal

    Focus: Annual Battery-Grade LiOH/LCE Tonnes, Production Cost ($/t LCE), CRMA Subsidy Grant & EBITDA
    Standard: EU Critical Raw Materials Act (CRMA 2024), EU Battery Regulation (EU 2023/1542), USGS DLE Standards
    directLithiumExtraction.tsOpen terminal
    institutional100% Pass

    offshore wind lcoe terminal

    Focus: Farm MWe, WTG Units, Monopile/Floating CapEx, Levelized Cost of Electricity (LCOE, €/MWh) & CfD Strike Revenue
    Standard: German Wind Energy at Sea Act (WindSeeG 2024), EU Offshore Renewable Strategy, DNV-ST-0126 Standards
    offshoreWindLcoe.tsOpen terminal
    institutional100% Pass

    carbon capture sequestration terminal

    Focus: Captured CO2 Tonnes/a, Levelized Cost of CCS (LCOCCS, €/t CO2), EU ETS Cost Avoidance & NZIA Grant
    Standard: EU Net-Zero Industry Act (NZIA 2024), EU ETS Directive, EU CRCF 2024 & ISO 27914 Storage
    carbonCaptureSequestration.tsOpen terminal
    institutional100% Pass

    battery recycling black mass terminal

    Focus: Black Mass Tonnes/a, Recovered Li/Ni/Co Tonnes, Metals Revenue (€), EBITDA & EU 2031 Quotas
    Standard: EU Battery Regulation (Regulation EU 2023/1542), EU CRMA 2024, LME Battery Materials Indices
    batteryRecyclingBlackMass.tsOpen terminal
    institutional100% Pass

    vpp flexibility optimizer

    Focus: Multi-Market Revenue Stacking (€), § 14a EnWG Rebates, Degradation Optimization & EBITDA
    Standard: German Energy Industry Act (EnWG §§ 14a, 13k), EU Electricity Market Design (EU 2024/1747), EPEX SPOT Rules
    vppFlexibilityOptimizer.tsOpen terminal
    institutional100% Pass

    space infrastructure capex terminal

    Focus: Satellites Count, Heavy-Lift Launches, Wright's Law Mfg CapEx, LCOB Bandwidth (€/GB) & EBITDA
    Standard: ITU Radio Regulations (WRC-23 NGSO Post-Milestone Rules), ESA Zero Debris Charter, FCC 5-Year Deorbit Rules
    spaceInfrastructureCapex.tsOpen terminal
    institutional100% Pass

    datacenter immersion cooling terminal

    Focus: PUE Reduction (< 1.08), Power Savings (€), Waste Heat PPA Offtake Revenue & EnEfG ERF Quotas
    Standard: German Energy Efficiency Act (EnEfG § 11), DIN EN 50600-4-6 (ERF), EU Data Centre Directive (EED 2023/1791)
    datacenterImmersionCooling.tsOpen terminal
    institutional100% Pass

    precision fermentation terminal

    Focus: Bioreactor Volume (L), Volumetric Productivity (g/L/h), Levelized Production Cost (LCOP, €/kg) & EBITDA
    Standard: EU Novel Food Regulation (Regulation EU 2015/2283), EFSA GM Scientific Guidance, GMP Annex 1
    precisionFermentation.tsOpen terminal
    institutional100% Pass

    evtol drone fleet economics terminal

    Focus: Fleet Sizing, Flight Distance (km), DOC (€/h), Seat-km Cost (€/pax-km), Battery Wear & EBITDA
    Standard: EASA Special Condition SC-VTOL-Enhanced, EU Drone Regulation (EU 2019/947 SORA 2.5), U-Space (EU 2021/664)
    evtolDroneFleet.tsOpen terminal
    institutional100% Pass

    dac mineralization terminal

    Focus: Net CO2 Removed (t/a), Thermal/Electric Energy Intensity, Levelized Cost of DACS (LCODACS, €/t) & EBITDA
    Standard: EU Carbon Removal Certification Framework (CRCF), ISO 14064-2, CarbFix Basalt Mineralization Protocol
    dacMineralization.tsOpen terminal
    institutional100% Pass

    solid state battery gigafactory terminal

    Focus: Deliverable Capacity (GWh/a), Scrap Yield (%), Levelized Cell Cost (LCOSC, €/kWh), Energy Density & EBITDA
    Standard: EU Battery Regulation (Regulation EU 2023/1542 / Digital Battery Passport), UN 38.3, IEC 62660-3
    solidStateBattery.tsOpen terminal
    institutional100% Pass

    post quantum crypto terminal

    Focus: Migration CapEx (€), Cyber Insurance Savings, DORA Penalty Mitigation & 5-Year NPV
    Standard: NIST FIPS 203 (ML-KEM), FIPS 204 (ML-DSA), DORA (EU 2022/2554), NIS-2 (EU 2022/2555), BSI TR-02102-1
    postQuantumCrypto.tsOpen terminal
    institutional100% Pass

    fusion energy lcoe terminal

    Focus: Thermal & Electric Power (MWe), Tritium Breeding Ratio (TBR), LCOE (€/MWh), EBITDA & Payback
    Standard: Euratom Research & Training Programme, IAEA Fusion Safety Standards, Radiation Protection Act (StrlSchG)
    fusionEnergyLcoe.tsOpen terminal
    institutional100% Pass

    subsea interconnector hvdc terminal

    Focus: Transmitted Energy (TWh/a), System Losses (%), Cross-Border Arbitrage (€), FCR Ancillary Revenue & LCOT
    Standard: EU TEN-E Regulation (EU 2022/869 / PCI), ENTSO-E TYNDP, German Grid Expansion Act (NABEG), CACM (EU 2015/1222)
    subseaInterconnectorHvdc.tsOpen terminal
    institutional100% Pass

    qkd optical satellite terminal

    Focus: Secret Key Rate (SKR kbps), Key Volume (Tbit/a), QBER (%), QaaS Subscriptions (€) & LCOK (€/Gbit)
    Standard: EU IRIS² Space Regulation (EU 2023/588), EuroQCI Charter, ITU Radio Regulations (WRC-23)
    qkdOpticalSatellite.tsOpen terminal
    institutional100% Pass

    sco2 allam cycle terminal

    Focus: Net Power (MWe), Net Efficiency (%), Pure CO2 Capture (t/a at 150 bar), Avoided ETS (€) & LCOE
    Standard: EU Industrial Carbon Management (COM(2024) 62), EU ETS Directive, EU CRCF, BImSchG
    sco2AllamCycle.tsOpen terminal
    Institutional Governance Standards & Audit-Proof Documentation
    AME Standard Autonomy & Audit
    Every calculation engine is encapsulated as a deterministic pure TypeScript module, with complete test coverage (100% pass) and evidence-based anchoring in the relevant standards.
    Evidence Checklists per Milestone
    No gate transition takes place without documented evidence (FDD/LDD, grid connection point (NVP) commitments, binding land-use plans (B-Plan), notarial deeds), systematically minimizing transaction and development risk.
    Bilingual Trinity Symmetry
    All governance definitions and terminals are available in German (formal register) and English with ≥95% content and technical parity.
    AME Module st · Strategie
    Strategy & M&A - Next step

    Probe a mandate in a structured conversation.

    60 minutes under NDA. We give you an honest assessment whether and in what form a mandate would hold. No cost. No follow-up obligation.

    NDA-First
    60 Min Discovery
    No follow-up obligation