EEW Funding Path Finder

Which EEW module fits your measure?

The EEW programme funds energy efficiency investments across six specialised modules - from cross-cutting technologies to process heat to transformation plans. Our finder maps your planned measures to the matching modules.

3 min.GDPR compliant

Do you recognize your investment?

Industry: Modernise cross-cutting technologies

Motors, pumps, compressed air, chillers - Module 1 funds replacement of inefficient existing systems with up to 40% grant for SMEs.

Modul 1bis 40 %

Decarbonise process heat

Switch from gas/oil to heat pump, biomass or direct electrification - Module 2 funds transformation of heat supply.

Modul 2Prozesswärme

Develop transformation plan

Module 5 funds development of a comprehensive climate transformation plan - prerequisite for the highest funding rates in Module 4.

Modul 5Planung

Identify EEW modules precisely

The Federal Funding Programme for Energy and Resource Efficiency in Industry (EEW) comprises six modules with different funding conditions, rates and combination options. Correct mapping saves time and maximises the funding rate.

Our finder matches your sector and planned measure types rule-based against current module requirements, and indicatively shows which EEW modules are applicable.

6EEW modules checked
3 min.Average check time
100%Rule-based, not AI-generated
CurrentEEW directive 2025/2026

What you need for the finder

What's already enough
  • Sector classification
  • Company size (SME yes/no)
  • Planned measure types
What can be added later
  • Investment volume & cost plan
  • Technical system specification
  • Energy savings proof / report
EEW Funding Path Finder
1
Profile
2
Measures

Fewer than 250 employees

Prefer to discuss directly?

Our advisors assess your funding options in a conversation - non-binding and confidential.

Methodology

Rule-based module mapping

The EEW funding path finder matches your inputs against current module requirements of the EEW directive. The mapping is rule-based - not AI-interpreted.

For a binding statement, a technical case-by-case review is required, taking into account investment volume, energy savings and technical system data.

Limitations of initial assessment
  • Specific funding amounts require an investment concept
  • Module combinations must be checked on a case-by-case basis
  • De minimis limits and state aid law must be observed
  • Application deadlines and budget funds may limit availability

Identify funding potential

Check in 3 minutes which EEW modules apply to your planned efficiency and process measures.

AME Module en--Energie
Energie & ESG - Nächster Schritt

Gemeinsam Ihr Energie-Portfolio in 60 Minuten sondieren.

Unter NDA. Wir schauen auf Ihre größten 3 Assets und nennen Ihnen die größten Hebel - kostenfrei. Yield-Modelle und Förder-Stack besprechen wir konkret.

NDA-First
P50/P90-Modell
Förder-Stack inkl.