Skip to main content

    iSFP: The renovation roadmap.
    Structure over guesswork.

    The individual renovation roadmap (iSFP) is the basis for funded, economically sound renovation. It prioritises measures and secures the 5% funding bonus.

    Eligible for funding. Structured. Binding.

    Why an iSFP makes sense

    Without a plan, measures are implemented in the wrong order (lock-in effect).

    The bonus (5% additional funding) is not granted without a roadmap.

    Banks and funding bodies increasingly require a structured renovation plan.

    Energy consultant costs are 80% funded (max. EUR 1,300 for single-family, EUR 1,700 for multi-family).

    Does this sound like your situation?

    Let's clarify in a free initial consultation whether and how we can help.

    What is an iSFP?

    The individual renovation roadmap is a standardised BAFA advisory instrument. It analyses the current energy state of a building and recommends a sensible sequence of renovation measures. The is a prerequisite for the 5% funding bonus on individual measures.
    BAFA guideline for residential energy advice (EBW), as of 2024. iSFP bonus: +5% on BEG individual measures (building envelope, building services).

    iSFP creation: process

    01

    On-site Survey

    Recording of current energy state: building envelope, windows, heating, ventilation.

    02

    Calculation

    Energy balance, savings potentials and economic assessment of measures.

    03

    Roadmap

    Prioritised measure sequence with timeline, costs and funding allocation.

    iSFP in numbers

    5%

    Additional funding bonus

    80%

    Funding of consultant costs

    15 yrs

    Recommended implementation horizon

    iSFP FAQ

    Related Topics

    Get your renovation roadmap created

    Start with the quick check to assess your needs.

    AME Module en · Energie
    Energy & ESG - Next step

    Let us scan your energy portfolio in 60 minutes.

    Under NDA. We look at your top 3 assets and identify the biggest levers - at no cost. Yield models and subsidy stack discussed concretely.

    NDA-First
    P50/P90 model
    Subsidy stack incl.

    Cookie Settings

    You choose whether to allow analytics and marketing in addition to essential functions. See our privacy policy for details about Google Analytics and data processing. Privacy Policy